怒江檬荚货运代理有限公司

Product search
Dual-mode TBM

Dual-mode TBM is mainly applied to big geology difference, long distance construction of tunneling project. Dual-mode TBM in the construction can according to hydrogeological condition change mode, to achieve that improve the rate of construction and reduce the cost of construction. Dual mode TBM has two type deslag mode or two type pressure balance mode’s full fracture surface TBM. Currently, have earth pressure, slurry Dual-mode TBM and earth pressure, rock Dual-mode TBM.

Dual-mode TBM which is produced by our company is a kind of derived equipment between balance TBM and shield rock TBM, have two different type TBM’s technical feature at the same time. When construction section geology appear large change, TBM handover suitable working mode, can make sure the safety and rate of construction, and can make sure the efficiency of whole construction. Currently, our company has produced more than 10 sets of such type TBM, mainly exported to Middle East.

TEL:+86 24 67859165;+86 24 67859170.E-mail:nhi-international@nhi.com.cn

 

辉南县| 汉沽区| 微山县| 玉龙| 东港市| 苏尼特左旗| 上犹县| 县级市| 衡东县| 讷河市| 大同县| 都兰县| 双牌县| 甘南县| 重庆市| 绍兴市| 江油市| 土默特右旗| 师宗县| 时尚| 百色市| 措勤县| 五原县| 根河市| 阜阳市| 理塘县| 德阳市| 黄大仙区| 白朗县| 旬邑县| 社旗县| 惠来县| 钦州市| 泸溪县| 溧阳市| 调兵山市| 修文县| 铜山县| 安阳市| 通许县| 泸定县|